Client:
Guild & Spence

Objective:
The amazing new headquarters for the international kiwifruit company required the best electrical and data communication services – the entire communication and electrical install was a multimillion-dollar investment!

Tiaki was engaged by Guild & Spence to provide seismic restraint design and construction monitoring for this enormous project. Tiaki was in close communication with G&S during the entire install and performed lots of inspections to make sure everything was built up to standard.

For cable type restraints, the easy to install & verify Gripple system was our choice. Concrete anchors were installed using Hilti special bolts & mortar.