07 577 1399
TAGS

Thompsons Horticulture 96m bridge over the Waipaoa River Te Karaka, Gisborne

Client
Thompsons Horticulture

Objective
Provide construction drawings for a single lane, 3 span bridge for Heavy commercial vehicles to access a Kiwifruit orchard in order to transport Horticultural supplies in and Kiwifruit out.

Bridge to comprise 3 x 32m spans utilising bored and cased single stem concrete piles/Piers supporting precast concrete crossheads that receive two 1.2m deep steel beams all with precast concrete deck panels over.