Te Puke – Bridge 91 ECMT Temporary Retaining wall Structural Design

Client
HEB Construction Limited

Objective
To complete structural designs and construction drawings for the design of a temporary retaining wall that was to be positioned infront of Bridge 91 ECMT’s future concrete cross head in Te Puke. 

The timber/steel retaining wall functions was to retain soil to be able to get access to install the new railway bridge.  It served as a unique construction solution which assisted the Contractor with fast tracking the works in accordance to specifications.