Oraka Farming Bridge

Autumn 2023

Project Client

Bridge It NZ

Background

Bridge It NZ’s client had three farming units that were separated by the Oraka Stream. Access between the blocks was limited, and the Farmer needed a solution that would allow him to run the property as a single unit.  A new bridge crossing the stream was the chosen solution. It needed to provide all-weather access for staff, stock and machinery, whilst achieving compliance with relevant Regional Plan requirements.

Project Objective

Tiaki Engineering Consultations (TECL) were responsible for the design and consenting of a new 18m concrete bridge with timber retaining. The new bridge is specifically designed to handle light traffic loadings to suit the requirements of on-farm use. Precast concrete beams meant a quick installation and the use of timber retaining allowed the bridge’s foundations to be set well back from the stream channel, minimising any adverse effects on the environment. A duct was incorporated to provide a convenient route for transporting piped services across the bridge. This bridge was constructed in under two weeks by the Bridge It team.

Project Details
Project name:Oraka Farming Bridge
Client:Bridge It NZ
Location:Tīrau
Project PartnersBridge It NZ
Structure:18m long
Completed:May 2023
tiaki jeandre
Jeandre Le Roux
Project Manager / Structural & Civil Engineer (CPEng)

Contact Us

Get In Touch

Our breadth of specialised knowledge has allowed us to provide and oversee unique and practical design solutions for a wide range of projects across the North Island, and as far as Scott Base, Antarctica.

Let’s discuss what Tiaki Engineering Consulting can do for your civil, geotechnical or structural engineering project.

Email Us

Email TECL directly and we’ll forward your enquiry to the most appropriate person.

Email Us

Email TECL directly and we’ll forward your enquiry to the most appropriate person.

Call Us

Prefer to speak over the phone? Let’s talk.

Call Us

Prefer to speak over the phone? Let’s talk.